Nanoen – In 2026, environmental inspection and compliance monitoring in industrial zones will continue to be strengthened by regulatory authorities. In Can Tho City, inspection plans are expected to be implemented in second and third quarters of 2026, requiring businesses to maintain continuous regulatory compliance.

In some cases, prior to the inspection, businesses may be required to prepare and submit a report on their compliance with environmental regulations. This report serves as an initial basis for authorities to assess compliance status and determine on-site inspection scope.

So, what should businesses prepare to effectively work with inspection teams? Below are the required documentation and operational aspects to be reviewed.


Environmental Legal Documentation

Environmental documents required for inspection including EIA report environmental permit and monitoring report

Mandatory Environmental Documents

These are the primary and most critical documents that inspectors will review. Businesses must prepare and consolidate the following:

Environmental Impact Assessment (EIA), Environmental Permit, or Environmental Registration

Depending on project scale and stage, documentation includes:

  • Approved EIA appraisal decision
  • Environmental Permit
  • Environmental Registration
  • Or other valid component environmental permits

For cases specified under Clause 2, Article 30 of Decree 08/2022/ND-CP (as amended by Decree 05/2025/ND-CP and Decree 48/2026/ND-CP), businesses must provide documentation for Environmental Permit (EP) adjustment where applicable.

Note: Under Law No. 146/2025/QH15, permit renewal has been abolished. Only issuance, re-issuance, or adjustment is applicable.


Annual Environmental Protection Report

Businesses are required to prepare and submit annual Environmental Protection Reports in accordance with Article 119 of the Law on Environmental Protection 2020.

Data Requirements:

  • Group I & II facilities: Data from the last 02 consecutive years
  • Group III facilities: Data from the last 01 year

Report Content:

  • Periodic environmental monitoring results (with laboratory certificates)
  • Automatic monitoring data (if applicable)
  • Solid waste and hazardous waste management records, including contracts and handover documents

Related Documents (if applicable)

Water Resource Exploitation Permit

Applicable to facilities extracting water (surface water, groundwater, or seawater).

Note: Wastewater discharge permits are now integrated into the Environmental Permit. Permits issued before January 1, 2022 remain valid until expiration.


Trial Operation Documentation

Applicable for facilities under commissioning phase:

  • Trial operation plan
  • Operation logbook

Environmental System and Waste Management

Beyond documentation, on-site inspection of actual operations is critical to compliance assessment.

Wastewater Treatment System (WWTP)

Hình ảnh hệ thống xử lý nước thải công nghiệp với bể xử lý, đường ống và thiết bị vận hành thực tế

Images of the aquaculture wastewater treatment system designed, constructed, and installed by Nanoen

The system must:

  • Operate in accordance with approved technical processes
  • Maintain operation logs (flow rate, parameters, chemical usage) for at least 02 years
  • Be equipped with flow meters and dedicated power meters

If connected to a centralized treatment system, pipelines must meet technical requirements and include flow measurement devices as per Decree 48/2026/ND-CP.


Air Emission and Dust Control

 

  • Air treatment systems must operate stably and meet applicable standards
  • Inspectors may conduct emission sampling for compliance verification

Sàn thao tác lấy mẫu khí thải trên ống khói đảm bảo an toàn và đúng quy định quan trắc

The exhaust gas sampling platform was designed by Nanoen

Businesses must ensure:

  • Safe and accessible sampling platforms
  • Properly designed sampling points for accurate measurement

Automatic Environmental Monitoring System (if applicable)

For required facilities:

  • Equipment must be calibrated and verified
  • Data must be continuously transmitted to the Department of Agriculture and Environment

Hazardous Waste Storage Area

Key inspection focus includes:

  • Storage duration: not exceeding 01 year
  • Infrastructure: must include fire prevention systems and spill containment measures
  • Proper packaging and storage equipment

Environmental Sampling and Analysis Readiness

Sampling and analysis of wastewater, air emissions, and noise are critical inspection components. Results are directly compared against national technical standards.

Authorities may conduct unannounced inspections when necessary. Upon presenting an official decision, businesses must allow immediate access to discharge points and waste generation areas.

Therefore, continuous compliance and stable system operation are essential.


Environmental Incident Response Plan

Businesses must develop and implement an environmental emergency response plan, including:

  • Incident scenarios (chemical spills, WWTP failures)

  • Response procedures in accordance with Decree 08/2022/ND-CP

  • On-site resources following the “four-on-the-spot” principle

  • Emergency drills conducted at least once every 02 years


Personnel and Coordination

  • Legal representative or authorized personnel must be present

  • Environmental staff must be capable of explaining technical operations

  • Businesses are fully responsible for the accuracy and transparency of provided information


 The 2026 environmental inspection plan is not only a regulatory activity but also an opportunity for businesses to review and improve their environmental management systems.

Proactive preparation helps businesses:

  • Enhance regulatory compliance

  • Minimize legal risks

  • Maintain stable operations

  • Achieve sustainable development

In an increasingly stringent regulatory environment, systematic preparation and continuous compliance are key to long-term success.


Nanoen Environmental Solutions

Nanoen provides comprehensive environmental solutions in the Mekong Delta region, supporting businesses in:

  • Environmental documentation consulting

  • System design and construction

  • Wastewater treatment operation and optimization

  • Supply of biological treatment solutions

We are committed to delivering cost-effective, compliant, and sustainable solutions.

Contact us for FREE consultation: 0941 777 519 – 0907 803 678 – 0901 229 798

Nanoen


NANO ENVIRONMENT TECHNOLOGY - CONSTRUCTION LIMITED LIABILITY COMPANY

Address:  661E/29 Vo Van Kiet, Long Tuyen Ward, Can Tho City

Hotline: 0941.777.519 - 0907.803.678 - 0901.229.798

Email: nanoentech@gmail.com

Facebook: www.facebook.com/nanoentech

Related Post
Messenger Zalo 0941.777.519